PostPosted: Mon Oct 24, 2005 7:52 pm 
Offline

Joined: Mon Oct 24, 2005 7:25 pm
Posts: 2
Location: Columbia, SC
I've read the Horvath and Hendrickson paper comparing the environmental impacts of two bridge designs. In that study, the bridges were functionally equivalent but the costs of the bridges were not. It appeared that the EIO-LCA model was used to estimate the LCI impacts of each bridge design given the amounts spent (delineated by sector). As the costs of the bridges are not equivalent, wouldn't it be important to investigate in what sectors the cost savings were applied?

Suppose that the EIO-LCA mode were used in the same fashion of that paper for the comparison of the following two alternatives that are functionally equivalent (e.g., two bridges with same lifetime, designed to handle the same maximum loading). If alternative A costs $1million with emissions of 10 mt PM10, and alternative B costs $2 million with EIO-LCA model emissions of 10 mt PM10, in the spirit of the EIO-LCA model, wouldn't there be fewer emissions if B were adopted, since the savings from adoption of A ($1 million) would be applied (of course with posssible economic benefit) to a sector(s) with associated emissions? Or have I lost my mind? It would seem important to factor in such emissions in an LCA comparison, or at least to note it.

_________________
~~~
Ken Harrison, Assistant Professor~University of South Carolina~Dept. of Civil & Environmental Engineering~300 Main Street~Columbia, SC 29208~Room C211~Ph: (803) 777-1917
~~~


Top
 Profile  
 
 Post subject:
PostPosted: Thu Oct 27, 2005 3:02 pm 
Offline

Joined: Sat Oct 01, 2005 12:14 pm
Posts: 6
Ken--

Not sure if this totally answers your question, but basically the EIO-LCA model operates linearly. As a result, if you spend $1 million on two bridges, you would be modeling that as $1 million spent twice in the "Highway, street, bridge, and tunnel construction" sector.

The model cannot differentiate between different types of bridges or any other product in a given sector due to aggregation. Consequently, if you spend $1 million each on two bridges, you will essentially be modeling the same thing in EIO-LCA. As a result, you will have the exact same environmental emissions for each (say 10 mt PM10) because you spent the same amount of money in the same sector to build each bridge.

However, if you spend only $100,000 on a bridge and the environmental value of PM10 emissions is, say, 0.00001 mt PM10/$ in the bridge construction sector, you would only have 1 mt PM10 emissions for this much cheaper bridge (less money, fewer emissions)

Thus, per EIO-LCA, as price reduction occurs, so do PM10 emissions and for a less expensive bridge (or any other type of product), you will have fewer emissions compared to a more expensive product from the same sector.


Top
 Profile  
 
 Post subject:
PostPosted: Thu Oct 27, 2005 3:09 pm 
Offline

Joined: Mon Oct 24, 2005 7:25 pm
Posts: 2
Location: Columbia, SC
Not really the question I was asking. In the paper I reference, the two bridges are made of different proportions of materials and the EIO-LCA modeling required the expenditures in different sectors corresponding to the material inputs.

Aurora wrote:
Ken--

Not sure if this totally answers your question, but basically the EIO-LCA model operates linearly. As a result, if you spend $1 million on two bridges, you would be modeling that as $1 million spent twice in the "Highway, street, bridge, and tunnel construction" sector.

The model cannot differentiate between different types of bridges or any other product in a given sector due to aggregation. Consequently, if you spend $1 million each on two bridges, you will essentially be modeling the same thing in EIO-LCA. As a result, you will have the exact same environmental emissions for each (say 10 mt PM10) because you spent the same amount of money in the same sector to build each bridge.

However, if you spend only $100,000 on a bridge and the environmental value of PM10 emissions is, say, 0.00001 mt PM10/$ in the bridge construction sector, you would only have 1 mt PM10 emissions for this much cheaper bridge (less money, fewer emissions)

Thus, per EIO-LCA, as price reduction occurs, so do PM10 emissions and for a less expensive bridge (or any other type of product), you will have fewer emissions compared to a more expensive product from the same sector.

_________________
~~~
Ken Harrison, Assistant Professor~University of South Carolina~Dept. of Civil & Environmental Engineering~300 Main Street~Columbia, SC 29208~Room C211~Ph: (803) 777-1917
~~~


Top
 Profile  
 
 Post subject:
PostPosted: Wed Nov 02, 2005 4:03 pm 
Offline
Site Admin

Joined: Sat Aug 27, 2005 1:01 pm
Posts: 90
Ken

I have asked Arpad Horvath to reply as well, but I will take a shot at your question too.


Quote:
I've read the Horvath and Hendrickson paper comparing the environmental impacts of two bridge designs. In that study, the bridges were functionally equivalent but the costs of the bridges were not. It appeared that the EIO-LCA model was used to estimate the LCI impacts of each bridge design given the amounts spent (delineated by sector).

As the costs of the bridges are not equivalent, wouldn't it be important to investigate in what sectors the cost savings were applied?



Yes, EIO-LCA was used in that paper to assess the environmental impacts. The paper discusses which specific EIO-LCA sectors were used for the various comparative analyses done.

The way that EIO-LCA works is that you give it inputs as the sectors affected by an increment of demand. You don't really include "cost savings" - you just estimate costs and look at the effects.

Anyway, I am guessing this sticking point is leading to your confusion, if you clarify we can try to help.

Quote:
Suppose that the EIO-LCA mode were used in the same fashion of that paper for the comparison of the following two alternatives that are functionally equivalent (e.g., two bridges with same lifetime, designed to handle the same maximum loading). If alternative A costs $1million with emissions of 10 mt PM10, and alternative B costs $2 million with EIO-LCA model emissions of 10 mt PM10, in the spirit of the EIO-LCA model, wouldn't there be fewer emissions if B were adopted, since the savings from adoption of A ($1 million) would be applied (of course with posssible economic benefit) to a sector(s) with associated emissions? Or have I lost my mind? It would seem important to factor in such emissions in an LCA comparison, or at least to note it.


Not sure what you mean by "the spirit of the model", but all EIO-LCA does is estimate environmental/energy flows. If it turns out that two options lead to similar effects, then separately you could argue that A is preferable to B due to lower life cycle costs.

-scott


Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 4 posts ] 

All times are UTC - 5 hours


Who is online

Users browsing this forum: No registered users and 4 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
cron
Powered by phpBB® Forum Software © phpBB Group